|
Golden Valley Health Center Clinic MK2 Engineers designed the mechanical, electrical and plumbing systems for the project and coordinated the design for the joint trench. This included designing the layout of ductwork, HVAC piping, plumbing piping, lighting and power distribution. The work we performed for the joint trench included designing the PG&E power and gas utilities for the site. This included PG&E gas and power tie-in, site gas distribution designs and power distribution.
|
![]()
|




